FREE ESTIMATES
FREE ESTIMATES
Signed in as:
filler@godaddy.com
VEGAS FLOORS can complete your flooring project in as little as one day.
Each morning, our crews arrive on-site at approximately 8:30 a.m. After greeting the customer, we review the application process and answer any questions. Our trucks are outfitted as mobile workshops with equipment and materials to tackle any challenges.
This is the VEGAS FLOOR 5-step application process
Our polyaspartic floor coating system (VEGAS FLOORS™) is superior to epoxy, used in many do it yourself (DIY) projects. Polyaspartic flooring has better abrasion and chemical resistance than epoxy. It also has a rapid curing time which means our professionally trained installers can refinish your floor in less than a day.
If you want a garage floor that is tough, easy to maintain, and long-lasting, then a VEGASFLOOR™ floor coating is your best solution. If it’s strong and durable enough for the US Navy, it will stand up to the demands of your garage.
As with any sort of coating surface, preparation is the most important step in the process. VEGEA FLOORS has invested in state-of-the-art Werkmaster™ diamond grinders and dustless self-contained vacuum systems to ensure that every floor we coat achieves an unbreakable mechanical bond to the substrate. After unloading the equipment, the crew will evaluate the concrete density to select the right type of diamond blades to grind the floor.
The crew will grind the entire floor surface, which profiles the substrate and opens the pores of the concrete. The edges are ground down using a hand grinder.
This ensures every square inch of the floor is properly prepared. The coating can be applied to vertical surfaces such as foundation walls, cinder block, wood baseboards and steps.
Before this is complete, these vertical surfaces are ground and cleaned of any debris
Hairline cracks naturally occur in concrete pads. These cracks must be opened using a diamond cutting wheel and then filled with a polyurea filler or cementitious mortar. Once applied, the filler cures in 25 minutes.
The excess can be ground off so that the floor is completely smooth and cracks invisible. In many cases the concrete floor has imperfections such as salt pits or other minor damage. These spots are also filled and ground down for a perfectly smooth surface.
With the grinding complete, the entire surface of the floor is vacuumed to remove any remaining dust or
VEGAS FLOORS uses a polyaspartic floor coating which is a 2-component system.
The crew mixes the 2 components adding pigment to the base coat that matches our customer’s choice of pre-blended vinyl flakes. The crew first rolls the base coat onto all vertical surfaces and heavily applies the flakes for consistent 100% coverage.
Excess material is vacuumed from the floor before the base coat is applied. The crew then proceeds to apply the base coat to the entire floor surface.
One crew member will roll the coating onto the floor and the other will broadcast the vinyl flakes. To achieve 100% coverage, three times the amount of material is broadcast in this process.
Once the entire floor surface is coated and flaked, the coating requires 60 minutes to cure.
As soon as the coating has completely cured, the crew begins to remove all excess flake material.
The floor is scraped with a flat metal-edge tool to knock down any standing flakes and make the flake base coat even and smooth. Once the entire floor is scraped it is again blown and vacuumed to remove any debris.
The clear VEGAS FLOORS™ top coat is applied with a squeegee and then back rolled. This process ensures that the top coat has a thick and even layer, which leaves a consistent finish that’s extremely durable.
The top coat requires:
Weather and environmental conditions can cause curing times to vary. Your VEGAS FLOORS design can advise you on curing times.
Finally, our crew will clean up the entire site and load up the truck with their equipment and materials.
VEGAS FLOORS provides a 7-year limited warranty for every Polyaspartic ™ floor coating project we complete. You get a signed warranty certificate that includes the date of purchase and details of warranty coverage.
VEGAS FLOORS can complete your flooring project in as little as one day.
Each morning, our crews arrive on-site at approximately 8:30 a.m. After greeting the customer, we review the application process and answer any questions. Our trucks are outfitted as mobile workshops with equipment and materials to tackle any challenges.
This is the VEGAS FLOOR 5-step application process
We love our customers, so feel free to visit during normal business hours.
15610 Harlem Avenue, Orland Park, Illinois 60462, United States
Mon | By Appointment | |
Tue | By Appointment | |
Wed | By Appointment | |
Thu | By Appointment | |
Fri | By Appointment | |
Sat | By Appointment | |
Sun | By Appointment |
WE GIVE GREAT FAST SERVICE ..AND ON DEMAND SERVICE YOU CAN BE PUT TO THE FRONT OF THE LINE!!
Sign up to be the first to know about our soft launch events.
Copyright © 2024 Vegas Floors Concrete coating experts - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.